NEOTEL DATA CENTRE – FIRE CEILING
Client: NEOTEL
Main Contractor: EDISON POWER / CONCOR
Architect: MRA DESIGNS
Size: 1641 m2
Project Value: R 4,400 000.00
Project Features
- Installation of 80mm x 60mm x 80mm Longitudinal and transverse GMS channels as a support substructure.
- Installation of 9mm Promatect H fillets to underside of channels.
- 9mm Durasteel Boards (2hr fire rated)
- Installation of 80mm x 140kg m3 rockwool insulation
- Sealing of all perimeters and penetrations with Promaseal A.
- Installation of a lockable access hatch.
- Structural design.
- Programme – Accelerated programme of 8 weeks achieved.